Before installing a curtain wall, consider what to do before you install it. Glass curtain walls are popular and can provide a compelling design statement. But a proper installation process is critical to the success of your project. Here are a few steps to install a glass curtain wall. Before you begin, keep in mind that curtain walls are large engineering projects. Therefore, all those involved in the construction process must know the factors that will determine their success.
Get all the materials you need before the glazier arrives on site. The contractor will arrange lifting equipment and storage for the materials. When the metal parts arrive, place them on the appropriate floor. Place the glass unit next to the column during installation. Proper positioning will minimize handling and potential loss due to damage. The installation steps of the glass curtain wall should be documented and followed by everyone. Good curtain wall installation guidelines can be found on the manufacturer's website, or a contractor can be asked to help with the process.
The next step in installing a glass curtain wall is to determine the type of glass. Some systems are designed to work with internal glass, while others work with external glass. Some curtain wall systems are glazed from both sides.
In addition to specifications and installation guidelines, curtain wall installation should include an on-site modeling process. It is best to request a field model of the installation process before finalizing the workshop drawings. This way, if anything goes wrong along the way, you can easily change the installation steps. In addition, a third party certification body should perform the site model and remember to take photos of the installation.
Next, install the backplane. Backboards are metal plates, usually galvanized steel or aluminum, that are attached to the curtain wall frame. In addition, install insulation between the back plate and the exterior cladding. These elements are essential for preventing water penetration. It can last a long time and cause significant damage before it is detected. The backboard is the second line of defense against water infiltration.